References

Professional supervision services

  • Construction of the Bar – Boljare highway, section Smokovac – Uvač – Mateševo;
  • Construction of the northern approach of the Sozina Tunnel with the Bistrica Bridge and the Raš Tunnel;
  • Construction of the Risan – Žabljak highway;
  • Construction of the Rožaja Bypass;
  • Construction of a bridge over the Port Milena Canal in Ulcinj;
  • Track rehabilitation in depots and workshops in Podgorica and Bar;
  • Rehabilitation and reclamation of tailings of lead and zinc mines in Mojkovac;
  • Rehabilitation of the pavement curtain of PSS at Tivat Airport;
  • Construction of access road and parking at Podgorica Airport;
  • Construction of the bridge “Rakonje” in Bijelo Polje;
  • Construction of a bypass in Bijelo Polje;
  • Overpass construction in Bar;
  • Reconstruction of the R-10 road, section Slijepač Most – Tomaševo;
  • Construction of the “Tivran” tunnel on the Ribarevina – Berane main road;
  • Reconstruction of the main road M-2 Podgorica-Petrovac (Section I: Vojislavljevića Street – Intersection for the Airport);
  • Reconstruction of the main road M-2.4, section Bar-Ulcinj with landslide remediation site “Kruče”;
  • Reconstruction of the main road Budva – Bar, locality Kufin;
  • Reconstruction of the main road Petrovac – Bar, locality Sutomore;
  • Reconstruction of the M-2.3 Podgorica – Cetinje road, km 40 + 100 – km 44 + 100, Obzovica – Brajići;
  • Reconstruction of the main road M-2.3 Podgorica – Cetinje, locality tunnel “Mekavac”;
  • Reconstruction of the regional road R-1 Cetinje-Njeguši, km 2 + 000 – km 21 + 500;
  • Reconstruction of the main road M-2.3 Cetinje – Budva, section: Košljun – Zavala, critical point no. 48, from km 57 + 000 to km 58 + 800;
  • Permanent rehabilitation of the Markovići landslide, at km 54 + 100 of the M-2.3 main road Cetinje – Budva section;
  • Reconstruction of road M-2.3 Podgorica-Cetinje km 7 + 300-11 + 500, locality Barutana;
  • Reconstruction of the main road M-2.3 (M-10) Cetinje – Budva, section Brajići – Lapčići;
  • Construction of a connecting road between the roads M-9 Mateševo-Kolašin and M-2 Podgorica-Bijelo Polje (Tara Bridge in Kolašin);
  • Construction works on the reconstruction of the M-2.4 Krute-Vladimir road – the crossroads for Ostros;
  • Construction works on the reconstruction of the M-2.4 highway Ulcinj-Sukobin, section: Vladimir (Ostros intersection) – Sukobin;
  • Construction of a bridge on the Ljuboviđa River with access roads and connection to the main road in the Donja rijeka – Latinska Kosa in Bijelo Polje Municipality;
  • Reconstruction of the main road M-2, section Ribarevina-Mojkovac, site “Lepenac” construction of III lane (km 1067 + 636 – km 1075 + 200);
  • Reconstruction of the main road M-2 Podgorica-Ribarevina, section Slijepač Most (construction of the third lane);
  • Reconstruction of the regional road R-20 (R-12) Berane-Trpezi-Kalače, section Berane-Petnjica, Phase II Berane-Podvade;
  • Reconstruction of tunnel 18 on the main road Podgorica – Kolašin;
  • Reconstruction of tunnel 33 on the main road Mojkovac – Kolašin;
  • Reconstruction of the Bakovići – Kolašin tunnel;
  • Reconstruction of the road Nikšić – Vilusi, section Trubijela – Vilusi, approx. 16 km long;
  • Reconstruction of the Rogami – Spuž road, approx. 5.0km in length;
  • Construction of a pedestrian bridge over the main road Podgorica – Bijelo Polje, in the municipality of Mojkovac;
  • Reconstruction of the road from the Ski Resort ”Kolašin 1450” – Jezerine – Ski Resort ”Kolašin 1600” – supporting structures – Phase II;
  • Reconstruction of the main road Podgorica – Tuzi, section from the roundabout Plantaže to Podvožnjak on the Cijevna river (approx. 4km);
  • Reconstruction of the M-18 main road, section: Tuzi-Pljoče;
  • Reconstruction of the M-18 Tuzi – Božaj highway;
  • Construction of the bridge on the Morača river on the route “Southwest Bypass (II section – from PR 84 to PR 97)”;
  • Reconstruction of the Krstac-Kuk-Ivanova Korita road, section Kuk-Ivanova Korita, 4.2 km long;
  • Construction of tunnels and reconstruction of Berane Kolašin road, Lubnica – Jelovica section;
  • Reconstruction of part of the main road M2, connecting two boulevards from Budva to Bečići with the reconstruction of the Budva-Cetinje-Bečići intersection;
  • Construction and reconstruction of the Podgorica – Kolašin highway;
  • Construction of border crossings Debeli brijeg, Dobrakovo and Dračenovac.

Technical documentation creation services

  • Preparation of technical documentation for reconstruction of the M18 main road, Danilovgrad – Podgorica;
  • Preparation of technical documentation for reconstruction of the M2 main road, Ribarevina – Pod section;
  • Preparation of technical documentation for the reconstruction of the road Dinoša – Zatrijebač;
  • Preparation of technical documentation for the reconstruction of the M-1 (M-2.4) highway, section: Bar – Ulcinj;ž
  • Preparation of technical documentation for construction of the bridge on the river Tara at the locations of KO Podbišće and KO Bjelojevići, in the municipality of Mojkovac;
  • Preparation of technical documentation for reconstruction of the regional road Danilovgrad – Čevo, section: Danilovgrad – Markovina, from km 0 + 000 to km 16 + 000, length L = 16 km;
  • Preparation of technical documentation for reconstruction of the regional road Vilusi – Vraćenovići, section Vilusi – Petrovići;
  • Preparation of technical documentation for reconstruction of the M-2.3 main road, sections Podgorica – Cetinje, Kokoti – Barutana – Kamenica;
  • Preparation of technical documentation for reconstruction of the M-2.3 main road, Podgorica – Cetinje section, Kamenica – Meterizi – Jankovića Krš – Ulići locality.

Our partners